CHANGYIN IN ACTIONInstallation Cases
Substrate bag production line and sterilization chamber installations
PROJECTS IN PRACTICE
Equipment installed at production sites
Actual installation images show equipment combinations, from substrate bag lines to sterilization chambers.

Substrate bag production line · Installation case
Eight-station Substrate Bag Production Line, Zunyi, Guizhou

Substrate bag production line · Installation case
Four-station Substrate Bag Production Line, Hanzhong, Shaanxi

Substrate bag production line · Installation case
Six-station Substrate Bag Production Line, Xinyang, Henan

Substrate bag production line · Installation case
Three-station Substrate Bag Production Line, Fushun, Liaoning

Substrate bag production line · Installation case
Six-station Substrate Bag Production Line, Chongqing

Substrate bag production line · Installation case
Two-station Substrate Bag Production Line, Kunming, Yunnan

Substrate bag production line · Installation case
Four-station Oyster Mushroom Line, Rizhao, Shandong

Substrate bag production line · Installation case
Four-station Wood Ear Line, Shigatse, Tibet
STERILIZATION SYSTEMS
Sterilization chamber and heat-source installations

Three 68 m³ sterilization chambers with a 2-tonne boiler

One 68 m³ chamber with a 1-tonne biomass boiler

One 13 m³ sterilization chamber with a 54 kW electric boiler
Cases and configurations are from the company brochure. Project configurations depend on site conditions.